Balcony products
Firestop
A separate firestop is available for the RPM drains, RDP renovation drains and flanged RPC roof drains. Combining our balcony drains (with a separate firestop, if necessary) with our balcony piping forms a system that will resist fire for up to 60 minutes, i.e. keeping the temperature elevation on the balcony at less than + 180 degrees.
Files
Contact us
Do you have questions about our products and services? Would you like to enquire about your order?
Use this form to send us a message.